New four story wing addition with 30 additional beds and a loft floor for 15 additional future beds.
Kapolei Medical Park – Kapolei, HI
New three-story, 51,000 s.f. concrete office building (two separate buildings). Project was core and shell only. The major tenant (50%) was Kaiser and they did their own build out. Other tenants completed interior build out with interior TI contractors.
Mercy Interim Hospital – Joplin, MO
This one-of-a-kind project resulted from the tornado that destroyed the Mercy Medical Center in Joplin Missouri. This was a design-build construction project where the hospital was built in modular units in California and shipped to Missouri and assembled. The scope was a 150,000 s.f. fully code compliant 120 bed hospital. Scope included a 20 bed ER with 3 trauma beds; 20 bed ICU; 2 story 80 bed med-surge & maternity unit; 4 operating rooms with pre-op and post-op; cath lab; full radiology department including 2 CT units, pharmacy, dietary and administrative offices. Due to the emergency situation the project was ‘fast-tracked’ with phased design and permitting and was completed in 9 months from the start of design to opening.
Shriners Hospital -Honolulu, HI
New three-story, 200,000 s.f. concrete replacement hospital. The scope as Owner’s Preconstruction Manager included design coordination, FF & E selection/coordination, bidding and contractor selection and construction contract negation to a GMP contract. CM Scope did not include construction coordination or administration.
The Queen’s Medical Center – Oahu
Proposed Queen Emma Tower Expansion – This project is for the initial planning and estimating for a new 430,000 square foot tower for expansion to the Queen’s Medical Center.